A Goa man paid Rs 2.4 lakh for a mobile home to accommodate caregivers while recovering from surgery, but got a rusted, unsafe structure; a consumer commission has now ordered the builder to refund him

rpresentational ai imagechatgpt



A Goa man paid Rs 2.4 lakh for a mobile home to accommodate caregivers while recovering from surgery, but got a rusted, unsafe structure; a consumer commission has now ordered the builder to refund him
Rpresentational AI image/ChatGPT

A Goa resident who ordered a customised mobile home to accommodate caregivers while recovering from surgery received an incomplete, rusted and unsafe structure despite paying ₹2.4 lakh. The North Goa District Consumer Disputes Redressal Commission has now directed the Pune-based fabricator to refund the amount with interest and pay additional compensation.The man, identified as Kuriakose, wanted a mobile home on wheels that could be placed outside his house in Carambolim, Goa. His existing home did not have enough space to accommodate caregivers during his recovery, so he decided to commission a separate structure.As reported by The Indian Express, Kuriakose found the fabricator through an advertisement on Facebook. He was attracted by the company’s customised design options and its promise to deliver the mobile home within four weeks. The deadline was important because he needed the accommodation for his post-surgery care.The project was finalised in February 2025 at a total cost of ₹3.12 lakh. However, the structure was not completed as promised, and the one delivered allegedly differed substantially from the approved design.

Paid ₹2.4 lakh but received a rusted structure

Photo: Canva

Photo: Canva

An architect engaged through the fabricator’s office prepared the design for the mobile home. Kuriakose paid ₹1 lakh on February 20, 2025, another ₹50,000 on February 22 and ₹90,000 on May 3. His total payment came to ₹2.4 lakh. He told the commission that the main frame and panels did not match the approved design. He also complained about poor workmanship and rusting on both the interior and exterior of the structure.When the work remained incomplete, he repeatedly contacted the fabricator through phone calls and WhatsApp messages, but alleged that his attempts were ignored. He even offered to arrange workers from Goa to finish the installation. The company’s office later agreed to provide a final installation schedule by June 21, 2025. However, the work was still not completed by that date, according to the complaint.

Architect found the mobile home unsafe

The commission examined an affidavit from the architect and her inspection report dated July 2, 2025. The report recorded several construction defects, serious deviations from the approved design and extensive rusting.According to the architect’s assessment, the structure posed safety risks and was not fit for use, particularly by someone recovering from surgery. She also told the commission that the construction had taken place without her supervision, consultation or approval. Her involvement had ended after she provided the design. The commission noted that the architect had been engaged by the fabricator itself, making her assessment relevant to the dispute.The fabricating firm was served notice but neither appeared before the commission nor filed a written response. The matter therefore proceeded ex parte, meaning the complaint was considered without the company’s participation.After examining the documents and affidavits submitted by Kuriakose and the architect, the commission concluded that the fabricator had failed to provide the service promised.

Consumer panel orders refund with interest

In its order dated November 3, the commission, headed by president Bela N Naik and member Auroliano de Oliveira, partly allowed Kuriakose’s complaint. It directed the fabricator to refund the ₹2.4 lakh paid by him, along with interest at 7% per annum. It also ordered the firm to pay ₹10,000 as compensation for mental agony and harassment. This brings the total amount ordered in his favour to ₹2.5 lakh, excluding interest.The commission further stated that if the refund and compensation remained unpaid after the appeal period, the amounts would attract interest at 3% per annum until final payment. The commission observed that the incomplete and defective structure had defeated the very purpose for which it was commissioned.



Source link